Dr Dipankar Bose
Qualification : Fellow (IIMC)
Email : dipankar@xlri.ac.in
Functional Area : Production, Operations & Decision Sciences
Brief Profile
- Bachelor of Engineering Jadavpur University Chemical 1999
- Fellow in Management IIM Calcutta Operations Management 2010
Experience Detail
- Associate Professor - XLRI Xavier Institute of Management (Production, Operations & Decision Sciences)
- Assistant Professor - Institute of Management Technology, Nagpur (Operations Management - 6 months)
- Engineer - Manufacturing Haldia Petrochemicals Limited (LLDPE Plant - 52 months)
Dr Dipankar Bose
Achievements and Research Interest/Area of Research Interests
Academic Distinction (Awards and Scholarships)
Adminstrative Distinction
Other Achievements
Area of RESEARCH INTERESTS
- Capacity Planning
- Large Scale Optimization Problem
- Manufacturing Flexibility
- Quality Control
Faculty Development Programs Attended
Courses Taught
1. Operations Management
Program: Business Management XLRI/Other: XLRI
2. Production Management
Program: Human Resource Management XLRI/Other: XLRI
3. Quality, Productivity and Strategy in Operations
Program: Executive FPM XLRI/Other: XLRI
4. Total Quality Management
Program: Business Management, Human Resource Management, General Management XLRI/Other: XLRI
Consultancy Undertaken
In-Company Programs
INTELLECTUAL CONTRIBUTIONS (PUBLICATIONS)
Journal Articles-Refereed
- Bose, D., & Guha, A. (2021). Economic production lot sizing under imperfect quality, on-line inspection, and inspection errors: Full vs. sampling inspection. Computers & Industrial Engineering, 160, 107565.
- Guha, A., & Bose, D. (2020). A note on “Economic production quantity in batch manufacturing with imperfect quality, imperfect inspection, and destructive and non-destructive acceptance sampling in a two-tier market”. Computers & Industrial Engineering, 146, 106609.
- Roy, A. S., Bose, D., & Bera, U. K. (2020). Assessment of residential institute foodservice using Kano categorization and importance–performance analysis. The TQM Journal. Vol. 32. No. 3. pp. 401-428.
- Bose, D., & Chakraborty, S. (2019). Managing In-play Run Chases in Limited Overs Cricket Using Optimized CUSUM Charts. Journal of Sports Analytics, Vol. 5. No. 4. pp. 335-346.
- Bose, D., Chatterjee, A. K., & Barman, S. (2018). Capacity decision under preset service level and process flexibility. Journal of Modelling in Management. Vol. 13. No. 3. pp. 755-772
- Bose, D., Chatterjee, A. K., & Barman, S. (2016). Towards dominant flexibility configurations in strategic capacity planning under demand uncertainty. OPSEARCH, Vol. 53. No. 3. pp. 604-619.
- Bose, D., & Chatterjee, A. K. (2015). Specialized versus Multi-skilled Workforce: A Newsboy Approach for Call Centre Resource Planning. Management and Labour Studies. Vol. 40. No. 3-4. pp. 252-267.
- Mitra, S. and Bose, D. (2005). Supply Chain Issues in the Indian Poultry-Meat Industry: The Case of a Vertically-Integrated Farm. Productivity. Vol. 46. No. 2-3. pp. 339-345
Published Research Monographs
Scholarly Books
Chapters in Scholarly books
Conference Proceedings-Refereed
- Effects of Price and Production Postponement on Capacity Planning (2014), with Samir Barman and Ashis Kumar Chatterjee, 2014 Annual Meeting of the Decision Sciences Institute (DSI 2014) Proceedings, PDF Link: http://www.decisionsciences.org/Portals/16/Proceedings/AM-2014/files/p747055.pdf
Paper Presentations-Refereed
- Optimal manpower planning in a call centre considering multi-skilled workforce: Impact of reference point, Dipankar Bose and Abhishek Chakraborty, POMS2019 Conference, Brighton, UK, September 2-4, 2019
- Signaling Supplier Capability using Cost of Quality Analysis: Payoff Maximization v. Inequality Aversion, Dipankar Bose and Sumit Sarkar, EURO2019 Conference, Dublin, Ireland, June 23-26, 2019
- Application of control charts to identify the change points in run chasing strategy in limited over cricket, Dipankar Bose, EURO2016 Conference, Poznan, Poland, July 3-6, 2016
- Optimal Manpower Allocation in Call Center under Uncertainty in Call Volume and Multi-Skilled Workforce, Dipankar Bose, Ashis Chatterjee and Samir Barman, EURO2013 Conference, Rome, Italy, July 1-4, 2013
- Strategic Capacity Planning under Dynamic Probabilistic Demand, Dipankar Bose and A.K. Chatterjee, EURO 2010 Conference on Operations Research, Lisbon, 2010 (Presented by A.K. Chatterjee)
- Benefits of Partial Product Flexibility, Chatterjee A. K. and D. Bose, 23rd European Conference on Operational Research (EURO 2009), Bonn, Germany, 2009 (Presented by A.K. Chatterjee)
- Capacity Planning under Demand Uncertainty: Production Postponement and Product Flexibility, Bose, D. and A. K. Chatterjee, CLAIO 2008, Cartagena de Indias, Colombia, 2008 (Presented by A.K. Chatterjee)
- Capacity Choice under Demand Uncertainty: Postponement Effects on Product Flexibility, Bose, D. and A. K. Chatterjee, Informs Annual Meeting, Washington, DC, 2008
Text Books
Research Report
Working paper
- Dedicated Versus Flexible Capacity Investment: Price and Production Postponement under Additive Demand Uncertainty, Bose, D. and A. K. Chatterjee, IIMC Working Paper 634, 2009
- Capacity Choice under Demand Uncertainty: Effects of Production Postponement and Product Flexibility, Bose, D. and A. K. Chatterjee, IIMC Working Paper 626, 2008
Key note presentation
Published articles in newspapers/magazines
Cases developed for Teaching purpose
Other Professional Activities
Reviewer/Referee in Journals/ Conferences etc
- European Journal of Operational Research (Elsevier)